Heating, ventilation and air conditioning (HVAC) balancing is the process of conducting a comprehensive inspection of all aspects of HVAC systems, even when the systems involve independent components. The purpose of the process is to ensure that HVAC systems are operating properly by delivering the correct airflow throughout the facility.
The need for HVAC balancing becomes particularly apparent, for example, when space occupancy or usage change over time, but HVAC systems are not adjusted to respond to these changes. Consequently, temperatures may fluctuate from space to space, resulting in rooms that are too hot or too cold.
Regular inspection and maintenance ensures that systems are operating optimally. This form of maintenance is generally conducted by HVAC balancing consultants trained to evaluate system interaction with other elements of the building.
[edit] Inspection components
A typical report details all equipment found, the normal operating range or load design and the actual conditions found. The report should include comprehensive visual and mechanical evaluations.
The visual inspection of the components will uncover air leaks, loose connections or joints, pinched or perforated ducts, blockages, inappropriate ductwork (too long, too small or too sharply turned) or other parts of the system that may be malfunctioning.
During the mechanical evaluation, technicians test system performance by measuring airflow. They also record humidity levels, heat gains and heat losses.
This report is then used as the framework for the necessary repairs or corrections that will optimise the equipment and return it to its original performance levels. It also notes other potential problems that may be discovered during the visual and mechanical inspection process.
[edit] Inspection outcomes
In addition to resetting HVAC systems to their proper operating conditions, balancing activities can help improve overall efficiency and decrease energy demands. HVAC balancing can also help to increase the operational lifespan of equipment by repairing mechanical issues that occur over time. Building occupants should also experience more comfortable temperatures and improved indoor air quality as a result of the HVAC balancing process.
HVAC balancing will also take place during the commissioning process. For more information see: Commissioning.
[edit] Related articles on Designing Buildings
- Air conditioning.
- Air infiltration testing.
- Amber warnings raise building overheating concern.
- Approved Document F.
- Building services.
- Commissioning.
- Confirming knowledge of building services.
- COVID-19 and the US HVAC sector.
- Ductwork.
- Effective ventilation in buildings.
- Humidity.
- HVAC.
- Indoor air quality.
- Mechanical, electrical and plumbing MEP.
- Training for pre-commissioning cleaning of pipework systems.
- UV disinfection of building air to remove harmful bacteria and viruses.
- Ventilation.
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.